AAC Middle Wallop – Wiltshire

Civils works to the existing cable duct gully running from the Southern to Northern face of the Hangar, as per the Designers specification, cable encapsulation in specialist duct piping, re-enforcement works to the Gully to enable installation of new concrete surface and backfill. In addition, the installation of 2nr high loadbearing manhole covers and chambers for future access to ductwork cabling.

Refurbishment works to office spaces, ablutions and kitchen areas around the perimeter of the hangar. To include painting, laying flooring, kitchen installation and installation of water heaters, provision of hot water to taps and installation of LED lighting and plug sockets.
Emergency lighting replacement where found to require upgrading and bringing in line with current regulations.

Refurbishment works to the main hangar area, to include painting the hangar walls and floor, light repair works to the hangar floor and application of line markings following the Contractor appointed line marking companies design being approved by the Client.

AAC Middle Wallop – Wiltshire
AAC Middle Wallop – Wiltshire
AAC Middle Wallop – Wiltshire
Scroll to Top